Your position: Home > Asia > 120T Straddle Lift Crane for India Bridge Construction

120T Straddle Lift Crane for India Bridge Construction

120T Straddle Lift Crane

Overview
Huadelift will provide a 120ton straddle lift crane that will be useful in transporting heavy materials across the bridge construction site. The India is known for its iconic infrastructure, including world-renowned bridges that connect the various regions of the country. Hence, there is a need for specialized equipment to assist in the construction of these bridges.

 

120T Straddle Lift Crane Solution
Our engineers will develop a design for the 120ton straddle lift crane that meets the requirements of the India bridge construction site. The straddle lift crane will be fabricated using high quality materials that meet industry standards, and a hydraulic system and other necessary components will be installed to ensure the optimal performance of the straddle lift crane.

 

120T Straddle Lift Crane    120T Straddle Lift Crane

 

The straddle lift crane has eight steering modes to choose from to meet customers’ specific steering requirements. For straddle lift crane configuration requirements, we communicate with our customers and strive to provide our customers with the most competitive price configurations, such as using Cummins diesel engines, SAUER-DANFOSS hydraulic systems, German Posital position sensors, Swedish Scanreco remote controls, and more.

 

Result
The project aims to provide India bridge construction teams with a specialized tool, the straddle lift crane, which will enhance their efficiency and safety during bridge construction. Now the straddle lift crane is working well at the customer site. Huadelift will follow the spirit of excellence and make the details better, which has been well received by customers.

Customize Solutions
Our teams are on hand to provide you with the right lifting solutions
Tips for Messages
Load capacity(ton)?
Span of the crane(m)?
Max. lifting height of the crane(m)?
What materials will be handled?
How many hours will the crane work per day?
Your project introduction: project working site, project budget, etc.

    Related Cases